14 research outputs found

    Optimal design of hybrid distillation-membrane processes based on a superstructure approach

    Get PDF
    Considerable effort is currently being put towards process intensification to design more sustainable and energy-efficient processes. Hybrid distillation-membrane processes are prime examples of such intensified processes. In this work, different strategies are presented for how to handle the complexity of the membrane network of the hybrid process in terms of initialisation and convergence for simulation and optimisation. A superstructure approach for optimisation of membrane networks within hybrid processes is presented and verified. The energy consumption and economic performance of a hybrid distillation-pervaporation process, as well as that of the corresponding extractive distillation process, to separate a minimum-boiling azeotropic mixture are compared for different feed compositions. The impact of membrane properties and cost is also briefly considered. The results show that the total heat duty for the hybrid process is always lower than that of the extractive process for the system considered, confirming that the hybrid process is more energy efficient. In terms of total annualised cost, however, the hybrid process is found to be more economically attractive at lower feed compositions, while the extractive process is preferred for higher compositions

    Single- and multi-objective optimisation of hybrid distillation-pervaporation and dividing wall column structures

    Get PDF
    The separation of azeotropic mixtures is often energy intensive, thus process intensification (PI) becomes an attractive route to enhance energy efficiency. Two of the most commonly used separation intensifications are dividing wall columns and hybrid distillation-membrane processes. In this work, three typical hybrid distillation structures, distillation followed by pervaporation (D-P), pervaporation followed by distillation (P-D), and distillation followed by pervaporation then by distillation (D-P-D), are considered and compared with a hybrid dividing wall column (H-DWC) structure, which is a highly integrated process combining a dividing wall column and a pervaporation membrane network. The four structures are compared by both single-objective and multi-objective optimisation. It is shown that the D-P-D and H-DWC structures require significantly lower total annualized costs than the other two designs due to requiring smaller membrane area, as these two structures use the membrane only to help the mixture composition cross the azeotropic point

    Exploring the Effect of College Students’ Civic Engagement on Transferable Capabilities during the COVID-19 Pandemic

    Get PDF
    [[abstract]]Civic engagement refers to the ways that citizens participate in the life of a community to help shape its future or improve conditions for others. While it might have been shaped by the COVID-19 pandemic recovery, this study explored how college students perceive civic engagement on selected campuses that were partially locked down. We sampled 1036 student volunteers from six universities in Taiwan by using a self-designed module of civic engagement and transferable capabilities. The Student’s t-test, ANOVA, regression, factor analysis, and structural equation modeling (SEM) were used to interpret the differences and relationships among these variables. This study provides a more detailed example of the current status of civic engagement and its relationship to transferable capabilities in a higher education setting. The related programs and institutions should take responsibility for enhancing students’ civic engagement and transferable capabilities during the pandemic. How to ameliorate the situation? The findings suggest that it is necessary to consider a student’s academic major, learning experiences in the department, and time spent on related activities during the pandemic recovery. The findings might prove useful to various campuses for enhancing ongoing practices for sustainable development.[[notice]]èŁœæ­ŁćźŒ

    A shortcut design method for complex distillation structures

    No full text
    Distillation is by far the most common fluid separation method in the chemical industry, and its design is routinely conducted using commercial design software, often based on initial shortcut calculations. Whilst simulation and optimisation of simple distillation systems are fairly straightforward, the design of more complex structures, such as dividing wall columns (DWC), can prove problematic due to failure to initialise or to converge, and no adequate shortcut methods exists for these structures. In this work, a novel shortcut method is presented which can solve the shortcut design problem simultaneously also for complex structures using a simple optimisation procedure without the need for iterative manual calculations. The method is illustrated by four case studies. The shortcut design variables obtained using this method can be used to initialise rigorous simulation or optimisation problems, thus greatly reducing the risk of initialisation failure or convergence issues, also for very complex structures

    CEPC Conceptual Design Report: Volume 2 - Physics & Detector

    No full text
    The Circular Electron Positron Collider (CEPC) is a large international scientific facility proposed by the Chinese particle physics community to explore the Higgs boson and provide critical tests of the underlying fundamental physics principles of the Standard Model that might reveal new physics. The CEPC, to be hosted in China in a circular underground tunnel of approximately 100 km in circumference, is designed to operate as a Higgs factory producing electron-positron collisions with a center-of-mass energy of 240 GeV. The collider will also operate at around 91.2 GeV, as a Z factory, and at the WW production threshold (around 160 GeV). The CEPC will produce close to one trillion Z bosons, 100 million W bosons and over one million Higgs bosons. The vast amount of bottom quarks, charm quarks and tau-leptons produced in the decays of the Z bosons also makes the CEPC an effective B-factory and tau-charm factory. The CEPC will have two interaction points where two large detectors will be located. This document is the second volume of the CEPC Conceptual Design Report (CDR). It presents the physics case for the CEPC, describes conceptual designs of possible detectors and their technological options, highlights the expected detector and physics performance, and discusses future plans for detector R&D and physics investigations. The final CEPC detectors will be proposed and built by international collaborations but they are likely to be composed of the detector technologies included in the conceptual designs described in this document. A separate volume, Volume I, recently released, describes the design of the CEPC accelerator complex, its associated civil engineering, and strategic alternative scenarios

    CEPC Conceptual Design Report: Volume 2 - Physics & Detector

    No full text
    The Circular Electron Positron Collider (CEPC) is a large international scientific facility proposed by the Chinese particle physics community to explore the Higgs boson and provide critical tests of the underlying fundamental physics principles of the Standard Model that might reveal new physics. The CEPC, to be hosted in China in a circular underground tunnel of approximately 100 km in circumference, is designed to operate as a Higgs factory producing electron-positron collisions with a center-of-mass energy of 240 GeV. The collider will also operate at around 91.2 GeV, as a Z factory, and at the WW production threshold (around 160 GeV). The CEPC will produce close to one trillion Z bosons, 100 million W bosons and over one million Higgs bosons. The vast amount of bottom quarks, charm quarks and tau-leptons produced in the decays of the Z bosons also makes the CEPC an effective B-factory and tau-charm factory. The CEPC will have two interaction points where two large detectors will be located. This document is the second volume of the CEPC Conceptual Design Report (CDR). It presents the physics case for the CEPC, describes conceptual designs of possible detectors and their technological options, highlights the expected detector and physics performance, and discusses future plans for detector R&D and physics investigations. The final CEPC detectors will be proposed and built by international collaborations but they are likely to be composed of the detector technologies included in the conceptual designs described in this document. A separate volume, Volume I, recently released, describes the design of the CEPC accelerator complex, its associated civil engineering, and strategic alternative scenarios

    CEPC Conceptual Design Report: Volume 2 - Physics & Detector

    No full text
    The Circular Electron Positron Collider (CEPC) is a large international scientific facility proposed by the Chinese particle physics community to explore the Higgs boson and provide critical tests of the underlying fundamental physics principles of the Standard Model that might reveal new physics. The CEPC, to be hosted in China in a circular underground tunnel of approximately 100 km in circumference, is designed to operate as a Higgs factory producing electron-positron collisions with a center-of-mass energy of 240 GeV. The collider will also operate at around 91.2 GeV, as a Z factory, and at the WW production threshold (around 160 GeV). The CEPC will produce close to one trillion Z bosons, 100 million W bosons and over one million Higgs bosons. The vast amount of bottom quarks, charm quarks and tau-leptons produced in the decays of the Z bosons also makes the CEPC an effective B-factory and tau-charm factory. The CEPC will have two interaction points where two large detectors will be located. This document is the second volume of the CEPC Conceptual Design Report (CDR). It presents the physics case for the CEPC, describes conceptual designs of possible detectors and their technological options, highlights the expected detector and physics performance, and discusses future plans for detector R&D and physics investigations. The final CEPC detectors will be proposed and built by international collaborations but they are likely to be composed of the detector technologies included in the conceptual designs described in this document. A separate volume, Volume I, recently released, describes the design of the CEPC accelerator complex, its associated civil engineering, and strategic alternative scenarios

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore